Gravelpave2 – Bike Rack Access – University of Colorado – Boulder, Colorado

shapeimage_3

Bike racks for students and faculty used Gravelpave2 to remain dry in rain and resist ice coverage in winter.

 

shapeimage_5

Andrews hall bike racks on Gravelpave2 porous paving.

 

shapeimage_7

Installation: Gravelpave2 is easily cut around the concrete anchors for the bike racks.

shapeimage_4

The red gravel fill is an attractive addition to the beautiful University of Colorado Campus.

 

shapeimage_6

Installation: Black Gravelpave2 is rolled out and cut to fit around the building and concrete anchors.

 

shapeimage_8

Installation: the high efficiency drainage base is placed. The University wanted extra-drainage capabilities for this application

Project Name:
University of Colorado – Andrews Hall Bike Racks

Location:
Colorado Springs, CO

Product Used:
Gravelpave2

Application:
Bike rack access

Install Date:
June 2009

Install Size:
180 sq. m (1,977 sf)

Client:
University of Colorado

Designer:
n/a

Contractor:
MGT Landscape & Kiewit Construction

Summary:
Two bike rack areas that provide bike parking with porous pavement and a very positive draining base so bike rack areas will remain dry even with rain or snow. The University has since specified this system for several more bike racks on campus and looks to be making it a standard for future construction on campus.